Great BritainENWall-hung gas condensing boilersQuinta Pro 30 - 45 - 65 - 90 - 115Installation andService Manual123157-AC
1.4 Homologations1.4.1. CertificationsCE identification noPIN 0063CL3333NOx classification5 (EN 297 pr A3, EN 656)Type of connection(Flue gas outlet)B
2 Safety instructions andrecommendations2.1 Safety instructionsDANGERIf you smell gas:1. Do not use a naked flame, do not smoke, do notoperate electri
Casing componentsOnly remove the casing for maintenance and repair operations. Putthe casing back in place after maintenance and repair operations.Ins
3 Technical description3.1 General descriptionHigh-efficiency wall-hung condensing gas boilers4 High efficiency heating (Production of domestic hot wa
CAUTIONThe pump may have a maximum input of 200 W. Use anauxiliary relay for a pump with a larger input.3.3.2. System in cascadeThe boiler is ideally
Boiler type Quinta Pro 30 45 65 90 115Nominal output (Pn)Heating System (80/60 °C)minimum-maximumkW 8.0 - 29.3 8.0 - 40.0 12.0 - 61.0 14.1 - 84.2 16.6
Boiler type Quinta Pro 30 45 65 90 115Electrical protection index IP X4DOther characteristicsWeight (empty) Total kg 53 53 60 67 68Mounting(1)kg 49 49
4 Installation4.1 Regulations governing installationWARNINGInstallation of the appliance must be done by a qualifiedengineer in accordance with prevai
DescriptionFlue gas thermostatCascade set (For fitting a Quinta Pro boiler in a Quinta cascade frame)Cascade setDuo and Trio low loss headersVarious c
4.3.2. Location of the appliance4 Before mounting the boiler, decide on the ideal position formounting, bearing the Directives and the dimensions of t
EG declaration of conformityThe device complies with the standard type described in the EGdeclaration of conformity. It was manufactured and commissio
4.3.4. Main dimensionsiConnection of the combustion gas exhaust pipe ; Ø 80mm (≤ 45 kW)Connection of the combustion gas exhaust pipe ; Ø 100mm (≥ 65 k
4.4 Positioning the boilerThe boiler is delivered with a mounting template.A suspension clamp situated at the rear of the casing enables theboiler to
4 Thoroughly flush the installation until the water runs clear andshows no impurities.nInstalling the boiler in existing installations4 Remove sludge
CAUTION4 The heating pipe must be mounted in accordancewith prevailing provisions.4 If installing shut off valves, position the filling/drainage valve
4.6 Gas connectionWARNING4 Close the main gas valve before starting work on thegas pipes.4 Before mounting, check that the gas meter hassufficient cap
Type Execution DescriptionC33 closed4 Exhaust of combustion gases above the roof.4 The opening for the air-supply inlet is located in the same pressur
4.7.3. Lengths of the air/flue gas pipesThe boiler is also suitable for longer chimney lengths withdiameters other than those indicated in the table.
nConnection in areas of different pressure (C53, C83)Combustion air supply and combustion gas discharge are possible invarious pressure zones, semi-CL
4 Always clean the ducts thoroughly in cases where lining pipes areused and/or a connection of the air-supply.4 It must be possible to inspect the flu
Power supply voltage 230 VAC/50HzRating of the main fuse F1 (230 VAC) 6.3 ATFuse rating F2 (230 VAC) 2 ATFan 230 VACCAUTIONThe following components of
Contents1 Introduction ...61.1 Used symbols ...
4.8.3. Standard control PCBVarious thermostats and controllers can be connected to the standardcontrol PCB (PCU) (X12 connector block).Access to the c
7. Connect the cable to the appropriate terminals on the connectorblock.8. Firmly retighten the cable clamps and close the control box.4.8.4. Connecti
3. Connect the pump connection cable to the cable in the instrumentbox that is connected with connector X8.4. Connect the pump connection cable to the
4.8.5. Connecting a third party control unitnConnecting modulating controller OTOpenTherm regulatorThe boiler is fitted with a OpenTherm connection as
4.8.6. Connecting the outside temperaturesensorBaOutside sensorAn outside sensor can be connected to the Tout terminals of theconnector. Where there
nFrost protection in combination with an outside sensorThe central heating system can also be protected against frost incombination with an outside se
4.8.9. PC/Laptop connectionA PC or Laptop can be connected to the telephone connector usingthe optional Recom interface. Using the Recom PC/Laptop ser
4.9 Optional electrical connections4.9.1. Box for the control PCBsThe control PCBs are positioned in the housing for PCBs. See theinstructions provide
4.9.2. Connection options for the 0-10 V controlPCB (IF-01)The IF-01 control PCB can be built into the instrument box or thehousing for the control PC
nAnalogue heat output-based control (%)The 0-10V signal controls the boiler output between 0% and 100%.The minimum and maximum values are limited. The
4.4 Positioning the boiler ...194.5 Hydraulic connections ...194.5.1 Flushin
nControl of external central heating pump (Pump)An external central heating pump can be connected to the Pumpterminals of the connector. The maximum i
4.9.4. Connection possibilities for the PCB (SCU-S03)If the boiler is fitted with the control PCB (SCU-S03), then this isautomatically recognised by t
4.9.6. Connection possibilities for the PCB (SCU-X02)The connection options for the control PCB (SCU-X02) are describedin the paragraphs which follow.
4.9.7. Connection possibilities for the PCB (SCU-X03)The control PCB SCU-X03 can control a modulating central heatingpump. Depending on the make and t
CAUTION4 If possible, use the pump modulation signal. Thisprovides the most accurate pump control.4 In positions 3 to 9 the control PCB receives no si
4.10 Electrical diagramT002602-C2 31K1X1X14X13X12X3X2X4X5X6X7X8X9X10X11X131PCX61 2 3GN/YWWHBLGB153X21/X61X81 2 3PUMP ABRBLGN/YW2 1 3X813 1 2X41SC
4.11 Filling the system4.11.1. Water treatmentIn most cases, the boiler and the central heating installation can befilled with normal tap water and no
4.11.3. Filling the systemCAUTIONBefore filling, open the valves on every radiator in theinstallation.In order to be able to read off the water pressu
5 Start-up5.1 Control panel5.1.1. Functions of the keys1Display2> [Escape] or key J3D Heating temperature key or [-]4N DHW temperature key or [+]
cFault:Boiler indicates a fault. This can be seen from the e codeand red display.IBurner level:Boiler is running at full or low load.]Frost protection
5 Start-up ...465.1 Control panel ...
4. Check the gas supply pressure at the measurement point C on thegas valve unit.WARNING¼ To ascertain the gas types permitted, see chapter:"Equi
7. The start-up cycle begins and cannot be interrupted. During thestart-up cycle, the display shows the following information:A short test where all s
5.4 Gas settings5.4.1. Adapting to another gas typeWARNINGOnly a qualified engineer may carry out the followingoperations.The boiler is preset in the
3.Set the boiler to full load. Press the two B keys simultaneously.The display shows h3. The symbol B appears.4. Measure the percentage of O2 or CO2 i
3. Set the boiler to part load. Press the [-] key several times untill3 is displayed on the screen.4. Measure the percentage of O2 or CO2 in the flue
13.Give all the instruction manuals to the user.5.6 Reading out measured valuesThe automatic control unit continuously measures various boilerparamete
The current values can be read as follows:1.Press the two f keys simultaneously. The symbol Q flashes.2.Confirm using key S. 5t is displayed, alternat
5.6.3. Status and sub-statusThe information menu Q gives the following status and sub-statusnumbers:State 5t Sub-status 5v0Rest0Rest1Boiler start (Hea
5.7 Changing the settingsThe boiler control panel is set for the most common heatingsystems. With these settings, practically all heating systems oper
Parameter Description Adjustment rangeFactory settingQuinta Pro30 45 65 90 115p19Minimum fan speed (Heating+DHW)G20 (Natural gas)(1)(x100 rpm)16 16 16
7.3 Standard inspection and maintenanceoperations ...667.3.1 Checking the hydraulic pressure .
Parameter Description Adjustment rangeFactory settingQuinta Pro30 45 65 90 115p37Release function0 = Hot water on1 = Release input1p38Release waiting
5.7.3. Modification of the installer-levelparametersParameters p17 to df must only be modified by a qualifiedprofessional. To prevent unwanted setting
Quinta Pro 45MMaximum heat inputFFactory settingQPower input (kW)RFan rotation speed (rpm)Quinta Pro 65MMaximum heat inputFFactory settingQPower input
1.Press the two keys f simultaneously and then key [+] until thesymbol ? flashes on the menu bar.2.Select the installers menu using the key S. c0de ap
5.7.6. Carrying out an auto-detectAfter removing a control PCB, an auto-detect must be carried out. Todo this, proceed as follows:1.Press the two keys
6 Switching off the appliance6.1 Installation shutdownIf the central heating system is not used for a long period, werecommend switching the boiler of
7 Checking and maintenance7.1 Maintenance messageBoiler maintenance is kept to a minimum. Nevertheless, werecommend having the boiler inspected and se
CAUTIONReset the maintenance message to zero after eachinspection.7.2.1. Resetting the automatic maintenancemessageA service message on the boiler dis
7.3 Standard inspection and maintenance operationsCAUTIONDuring inspection and maintenance operations, alwaysreplace all gaskets on the parts removed.
7.3.4. Checking combustionThe check on combustion is done by measuring the percentage ofO2/CO2 in the flue gas discharge flue. To do this, proceed as
- 123157-AC5
5. Tilt the control box forwards by opening the holding clips locatedat the sides.6. Check whether there is any water in the small hose on theautomati
7.3.7. Checking the burner and cleaning the heatexchangerCAUTIONDuring inspection and maintenance operations, alwaysreplace all gaskets on the parts r
7.4 Specific maintenance operationsIf the standard inspection and maintenance operations have revealedthe necessity to carry out additional maintenanc
7.4.2. Replacing the non-return valveReplace the nonreturn valve when faulty or when the maintenance kitcontains one. To do this, proceed as follows:1
7.4.3. Assembling the boiler1. Follow the procedure in reverse to re-assemble all of thecomponents.CAUTIONDuring inspection and maintenance operations
8 Troubleshooting8.1 Error codesThe boiler is fitted with an electronic regulation and control unit. Theheart of the control system is a microprocesso
ErrorcodeDescription Probable causes Checking / solutione[04e[05Temperature of heatexchanger too lowExchanger temperaturetoo high4 Bad connection4 Sen
ErrorcodeDescription Probable causes Checking / solutione[145 burner start-up failures4 Absence of ignition arch4 Check cabling of ignition transform
ErrorcodeDescription Probable causes Checking / solutione[38Communication errorwith the SCU PCB4 Bad connection4 Defective SCU PCB4 Check the wiring4
ShutdowncodeDescription Probable causes Checking / solution5v[0Parameter error4 Parameter error on thePSU PCB4 Reset df and dV4 Restore parameters wit
1 Introduction1.1 Used symbolsIn these instructions, various danger levels are employed to draw theuser's attention to particular information. In
ShutdowncodeDescription Probable causes Checking / solution5v[20 (1)Configuration procedureactive4 Active for a short timeafter switching on theboiler
8.3.1. Error readout memorised1.Press the two keys f simultaneously and then key [+] until thesymbol c flashes on the menu bar.2.Select the installers
8.3.2. Deletion of the error display1.Press the two keys f simultaneously and then key [+] until thesymbol c flashes on the menu bar.2.Select the inst
9 Spare parts9.1 GeneralWhen it is observed subsequent to inspection or maintenance workthat a component in the boiler needs to be replaced, use only
Quinta Pro 30/45T002946-BEV 90552-1-420012021201620252017200620012003202220472023202420192020200710032026203020144007300630142013400820144007201020152
Quinta Pro 65T002952-BEV 90553-1-420172017201610032026201440072025401130063014200620102001100130043007200930132029203020082003100230113010300120473005
Quinta Pro 90T002958-BEV 90554-1-420172017201610033013203020144007202530063014200620012014400720134008100130072009200820031002301630113015301030012047
Quinta Pro 115T002964-BEV 90555-1-42017201720161003203020144007202520062001201440072013400810012009200820031002204720292028202620312032202740062033201
10 Checklists10.1 Checklist for commissioningNo. Work to be undertaken for commissioning Attachment / Measuredvalues1 Filling the central heating syst
10.2 Checklist for periodic inspection and maintenanceInspection and/or service activities Confirmation and date1 Checking the hydraulic pressure (Rec
In the interest of customers, we are continuously endeavouring tomake improvements in product quality. All the specifications stated inthis document a
10. Checklists Quinta Pro 30 - 45 - 65 - 90 - 11588 - 123157-AC
Broag Ltd.Remeha HouseMolly Millars LaneRG41 2QP WOKINGHAM,Berks.Tel: +44 118 9783434Fax: +44 118 9786977Internet: uk.remeha.comE-mail: boilers@broa
Kommentare zu diesen Handbüchern